02
Module 02

Pre-Functional Checklists

Replace paper checklists with structured digital forms that multiple contractors fill at the same time.

BuildingCX pre-functional checklist form with checkboxes, measured values, and digital signatures

Pre-functional checklists are the backbone of commissioning. BuildingCX lets you create structured digital forms from a global template library, assign them to equipment, and have multiple contractors fill their sections simultaneously. Phase-gated signatures ensure trades sign first, then the CxA approves. Every completed form exports to a professional PDF.

Key capabilities

What you can do with Pre-Functional Checklists

Six things that make Pre-Functional Checklists indispensable for your commissioning workflow.

01

Global template library

Clone from built-in templates (chiller, boiler, AHU, etc.) or create your own. Customize per project.

02

Rich item types

Checkboxes, measured values with units, text notes, and N/A marking — structured data, not just checkmarks.

03

Multi-contractor editing

Multiple contractors fill their sections at the same time. Real-time sync means no version conflicts.

04

Phase-gated signatures

Trade contractors sign first. CxA reviews and approves. The workflow enforces the right order.

05

PDF export

Export to a branded PDF with every signature, value, and note embedded. Professional output for submittals.

06

Status workflow

Draft → In Progress → Submitted → Approved. Submitted locks all fields. Approved requires CxA role.

Ready to try it?

Start your first project free. No credit card required.

Get started free