Commissioning for office towers, retail, and mixed-use
Commercial buildings have complex HVAC, lighting, and controls systems that all need to work together. BuildingCX gives you the tools to verify every system — from air handling units to building automation — in one integrated workflow.
Get started freeCommercial commissioning involves dozens of equipment types across mechanical, electrical, and controls disciplines. Air handlers, chillers, boilers, VAV boxes, lighting controls, fire alarm, and elevator systems all need pre-functional verification and functional testing. BuildingCX's template library includes pre-built checklists for common commercial equipment, and the multi-trade workflow ensures each contractor fills their section before the CxA approves.
Per-equipment tracking, not spreadsheet sprawl
Hundreds of equipment tags across multiple floors and systems, tracked in a spreadsheet that stops scaling somewhere around floor four.
Every piece of equipment gets its own progress bar. Filter by system, floor, or trade to see exactly where things stand.
Coordinated trades, not sequencing guesswork
Mechanical, electrical, and controls contractors all need to finish before systems can be tested together — and nobody's sure who's actually done.
Start with templates for common commercial equipment — AHUs, chillers, boilers, VAVs — and customize per project so every trade's status is visible in one place.
Live readiness, not a bottleneck at the end
Commercial projects run on strict timelines, and commissioning can't afford to be the thing holding up occupancy.
The dashboard updates as contractors work — know the moment equipment is ready for testing, instead of finding out in a closeout meeting.
Twelve floors, one filter
You need to know if the fourth-floor VAV boxes are ready for controls testing. You don't call the mechanical contractor — you filter the tracker by floor and system, and the answer is already there: 18 of 20 complete, two flagged with open issues.
The modules that matter most
Pre-Functional Forms
Structured checklists for every equipment type in your commercial project.
Functional Testing
Step-by-step test procedures to verify systems work as designed.